Services · 02
Nine things we do
besides sell totes.
Short answer
- Toll washing: we process totes you own and send them back
- Diversion certificates issued for ESG reporting
- Free pickup above 24 units in our active lanes
- UN re-marking in four days after test, not three weeks
Which service do you need?
The nine
Pick the one that matches your problem
S-01
Sell Us Your Totes
We buy empties by the pallet or the trailer and pay on pickup.
- Rolling bids on 4 to 400 units
- Free pickup above 24 units in our lanes
- Hazmat residue screened before we quote
S-02
Washing & Reconditioning
Caustic, hot-water and solvent lines with certificates attached.
- Three wash chemistries
- Interior camera inspection
- Leakproofness test at 3 psi
S-03
Rebottling
Cage in, new bottle out, same asset history.
- Food or industrial resin bottles
- Cage shot-blasted and straightened
- Old bottle granulated, not landfilled
S-04
Recycling & Resin Recovery
Granulation, regrind sales and steel baling.
- Natural and mixed-colour HDPE regrind
- Baled galvanised steel to mill spec
- Weight tickets and diversion certificates
S-05
Freight & Logistics
LTL, flatbed and full-trailer tote moves in 48 states.
- Up to 42 empties nested per 53-ft van
- Dock, lift-gate and ground-drop options
- Reusable dunnage, no stretch-wrap waste
S-06
Tote Pooling & Fleet Management
A managed returnable container pool with asset tags.
- QR asset tags and cycle counts
- Guaranteed replacement float
- Monthly utilisation reporting
S-07
UN/DOT Testing & Certification
Leakproofness, hydrostatic and stack testing, documented.
- 2.5-year and 5-year periodic tests
- Vibration and drop testing on request
- Re-marking under our registration code
S-08
Custom Fabrication
Cut-downs, manifolds, insulation jackets and skids.
- Open-top conversions and cut-down tubs
- Multi-tote manifolds with isolation valves
- Insulated jackets and band heaters
S-09
Site Decommissioning
We clear a yard of dead totes and leave it empty.
- Mixed-condition loads accepted
- On-site triage: resell, recondition, recycle
- Single diversion certificate for the whole clear-out
How the nine fit together
Each service is one station on the same loop
These are not nine unrelated product lines. They are the stations a single container passes through, repeatedly, over a working life of about twenty-two fill cycles across three bottle generations.
A tote leaves a filler, we collect it, wash it, test it, regrade it and resell it. When the bottle finally ages out we rebottle the cage and the loop restarts. When the cage fails, recycling recovers both materials. Freight ties every station together, and pooling is simply the whole loop operated as a subscription instead of a purchase.
Owning every station is what lets us say nothing landfills — there is no point in the chain where we hand a problem to someone whose incentives differ from ours.
Lead times
What each service actually takes
Published because 'call for lead time' wastes everyone's week. These are typical, not promises — a 400-unit reconditioning order books differently from four.
| Service | Typical turnaround | What drives it |
|---|---|---|
| Buying your empties | Bid same business day; pickup 2 – 7 days | Lane density and whether a manifest is needed |
| Reconditioning / toll wash | 5 – 9 business days | Chemistry required and wash-line queue |
| Rebottling | 7 – 12 business days | Bottle stock in your resin and colour |
| Recycling intake | Immediate; certificate in 5 days | Weigh tickets and granulation scheduling |
| Freight booking | 1 – 3 business days to dispatch | Lane, equipment type and dock constraints |
| Pool onboarding | 2 – 3 weeks | Asset tagging and float build |
| UN testing & re-marking | 4 business days after test | Test bay queue only |
| Custom fabrication | 2 – 4 weeks | Drawing complexity and material lead time |
| Site decommissioning | 1 – 3 weeks from survey | Volume, access and mix of condition |
What each service needs from you
The information that makes a service quote fast
Nearly every delay on a service quote is a missing fact rather than a busy queue. This is what each desk actually needs in the first message.
| Service | Must have | Helpful | Blocks the quote if missing |
|---|---|---|---|
| Buying your empties | Unit count, prior contents, postcode | Photographs, condition split | Hazmat without a manifest |
| Washing & reconditioning | Prior contents, unit count | Target grade, gasket compound | Unidentifiable residue |
| Rebottling | Cage photographs, unit count | Resin preference, manufacturer | Nothing — we assess on arrival |
| Recycling | Unit count, rough condition | Prior contents by batch | Hazmat without a manifest |
| Freight | Origin, destination, unit count | Dock, forklift, access, surface | Nothing, but expect follow-up |
| Tote pooling | Annual turns, destination count | Current fleet size and attrition | Nothing |
| UN testing & certification | Marking strings or plate photos | Fleet list with moulding dates | Illegible plates |
| Custom fabrication | What the item must do | Dimensions, liquid, handling method | Nothing — describe the job |
| Site decommissioning | Rough count, postcode, two photos | Deadline, access, known contents | Undrained containers |
The right-hand column is short on purpose. Almost nothing genuinely blocks a quote except undocumented hazardous residue and containers that still hold product — and both of those are regulatory limits rather than preferences.
How services are priced
Four different pricing structures, and why
Not everything here is priced per unit, and knowing which structure applies makes a quote much easier to read.
| Structure | Services | Driven by | Where it bites |
|---|---|---|---|
| Per unit | Reconditioning, rebottling, certification | Labour and consumables per container | Small batches carry setup cost |
| Per load | Freight, collection, decommissioning haulage | Equipment and distance | Part loads are disproportionately expensive |
| By weight | Recycling, scrap purchase | Prevailing regrind and mill markets | Quoted on the day, not from a sheet |
| Per turn | Tote pooling | Cycle count, not container count | Low utilisation makes it look expensive |
Short answer
- Per-unit services get cheaper with batch size
- Per-load services get cheaper with fill rate, not distance
- Weight-based prices move weekly — ask on the day
- Per-turn pricing rewards utilisation, not ownership
From the Yard Journal
Longer pieces from the people who run the wash line, the test bay and the trading desk.
21 May 2026 · 4 min
What a crushed cage tells you about the bottle inside
Counterintuitively, the worse the cage looks, the better the odds on the bottle. We pulled three years of intake records to check.
Priya Raghunathan · Head of reconditioning
Read5 March 2026 · 4 min
Tote pooling maths for a blender shipping to forty customers
A worked example with real numbers: when a managed pool beats owning containers, and the two conditions under which it does not.
Dale Ferreira · Logistics lead
Read5 September 2024 · 4 min
What regrind buyers actually pay for
Colour and melt index, in that order. Sorting to that granularity cut our granulator payback from 4.5 years to 3.2, and nobody modelled it in advance.
Theo Marsh · Materials & reporting
Read
Next move
Not sure which service covers your situation?
Describe the problem rather than the service. 'Two hundred totes behind the building, some cracked, nobody knows what was in forty of them' is a decommissioning job, and we have heard it before.